The modules are stripped of the old HO stuff, moved back out to the layout building, and almost ready to start with the new On30 design.
All that is left to do before starting track is to cut 2 new top pieces of 3/4 foam to level the tops with the bench work and provide depth for water ways to be cut.
One of these is 5' long and the other is 7' giving me a total of 12' X 2' to work with.