Tuesday, September 8, 2015

Benchwork

 
The room has finally progressed to the point where I can start to put brackets for benchwork.  The lower deck will contain my On30 module and will eventually expand around the room.  It is just right to be operated from my rolling desk chair.
 
 
The upper deck will be HO and I am tentatively building from this plan.
 


I also spent a bit of time at the bench doing some more detailing, including eye bolts on my GP7s and GP7rs.
 




 


1 comment:

  1. Been enjoying the blog. I like the track plan in this post. Does this plan replace the "current plan" behind the "Current track plan" menu?

    Using the lower deck for "additional modeling" or "rubber gauging" should work. Been considering that myself too.

    The BAR locomotives are nicely done.

    Dave K.
    http://www.sn2modeler.com

    ReplyDelete